How long will it take for the design and installation of my new WI, SA, or WME?
The District's design time is 6 to 10 weeks, depending upon the size and complexity of the project and our workload. There is also an approximately 30-day period from the time an applicant receives the agreements and cost estimate, to when the payment and signed agreements are due. For District-installed projects, the design is then processed and sent to the District's Operations and Maintenance (O&M) crews for installation. Issuance to O&M and actual installation usually requires 3 to 6 weeks.

For applicant-installed projects, the District prepares construction documents for installation by the applicant's contractor. Construction document preparation usually requires one to three weeks. The installation time is contingent on the applicant schedule.

Show All Answers

1. I'm not sure what I really need for my project; can I call the District and set up a meeting to discuss?
2. What do I need to provide the District to get water service?
3. What is the difference between a walk-in service, a service agreement, and a water main extension agreement?
4. Can the District suggest a meter size or fire service size?
5. Do I need a meter for each building?
6. How long will it take for the design and installation of my new WI, SA, or WME?
7. Can I change the location of my new service, and whom should I call?
8. Will the District contact me during the design of my SA of WME?
9. Who should I call to find out the status of my water service project (WI, SA or WHE)?
10. Once the design of my project is complete, whom should I contact for installation?
11. What do I need to do to get the water turned on once the facilities are installed?